The ACM panel installation project started on July 15th, 2023 and concluded on June 10th, 2024. The schedule encompassed 5 weeks dedicated to mobilization and installation. A team of 5 installed a total of 30,000 sq. ft. of ACM panels during this period.
Fiber cement panels are durable, versatile building materials made from a blend of cement, cellulose fibers, and sand. These panels are known for their resistance to fire, moisture, and pests, making them an excellent choice for both interior and exterior applications. They offer a range of aesthetic options, including various textures and finishes that mimic natural materials like wood or stone.
The Oak and the West Falls Development aim to redefine West Falls Church as a model for sustainable, community-focused urban living, offering an attractive blend of residential comfort, economic vitality, and public engagement. It serves as a beacon for how mixed-use developments can enrich neighborhoods while maintaining a connection to their cultural and historical roots.
"The precision and efficiency demonstrated in aligning and securing each panel not only met but exceeded our expectations. The finished result reflects a high level of craftsmanship and attention to detail, showcasing your team’s dedication to quality and excellence in every aspect of the project."
-General Manager, Tara Jackson